Attached Timer event - step execution on deadline

The Step execution on deadline connector allows you to implement the attached timer event.

To do that, you have to: - define a local variable of type Boolean in the step you want to add attached event. - set the default value to false - add a deadline with this connector, provide the name of the variable

The connector will set the variable value to true and execute the step.

Category: 
Licence: 
GPL v2

Downloads

Total downloads: 493
Version BonitaBPM Version Post date Download Link to content
1.0 5.x 2010-Jul-06 Download
493 downloads
Release note
Downloads: 
5
Notifications