Submitted by asmahassani on Fri, 07/14/2017 - 11:12
Hello,
i need to have an interface with 3 buttons, each button redirect user to a new step after a parrallel AND gateway in my process.
what should i do in the first interface? i think i must do something on buttons ?
Hi,
I use Bonita BPM 7.3.1 local on Windows 7. I m novice at bonita
I have a question. I need to select some data sets from Oracle DB.
I d read a lot of topics at this forum and others.
And I resolve this problem like this:
I create Process Variable with type List
Then I create in Connectors In new Connector to my base with query , scripting Mode and assign to my process variable (type List) data from query result, by this script: